Activate VMC for IPC


In this project, we used IPC for vehicle configuration and pricing, so we need to activate VMC which is the must step for IPC.

1. IPC version: 5.0

This is as add-in components of AP7.0, and for AP7, you can get from SAP.

2. Basic architecture:

1

3. Activate VMC: T-code RZ10

vmcj/option/maxJavaHeap     200M
vmcj/enable                         on
vmcj/option/ps                     768M

4. Restart SAP system

5. Check VMC status: T-code SM52

If the VMC is activated, refer the screen below:

2

OK, if you see the above screen, that means the VMC was activated, in the next article, we will go into the topic for how to activate IPC connection.

Additional information: ref the note: 854170


About The Author

从事SAP行业有些年头,对SAP技术稍有了解; 如无特别声明,本博客文章为原创,转载请注明; 博主MSN:xuchunbo0901@hotmail.com; 博主邮箱:bob.xu@abaptech.com。

No Comments

Leave A Reply


注意: 评论者允许使用'@user空格'的方式将自己的评论通知另外评论者。例如, ABC是本文的评论者之一,则使用'@ABC '(不包括单引号)将会自动将您的评论发送给ABC。使用'@all ',将会将评论发送给之前所有其它评论者。请务必注意user必须和评论者名相匹配(大小写一致)。

无觅相关文章插件,快速提升流量